CHICAGO O’HARE
AIRPORT
DEVELOPMENT TEAMConstruction Progress Photos May 30, 2005 through June 5, 2005
|
|
|||
Terminal 1, 2 and 3
F.A.C.E. Project H1097-08
|
|||||
|
Phase 2EX1 New Drainage Structure
Phase 2EX2 Left Sloped Slab Phase 2EX2
Tunnel 2B Roof Through Bolts |
Phase 2C3 Caulking Shroud Piece for Mockup Phase 3EX5 Demolition
of Roof of Tunnel 3C
Phase 3EX2 Tunnel 3B Placing Concrete on
Sloped Slab |
|
|||
|
Phase 3EX5 Removal of Escalator from Tunnel 3C |
Phase 3EX5 Tunnel 3C – Demolition of Floor Around
the
Elevator Pit
|
|
|||