CHICAGO O’HARE AIRPORT

 

DEVELOPMENT TEAM

Construction Progress Photos

 

May 30, 2005 through June 5, 2005                                                                                            

 

 

 

 

Terminal 1, 2 and 3 F.A.C.E. Project H1097-08

 

         

         

                     Phase 2EX1 New Drainage Structure 

 

              

                           Phase 2EX2 Left Sloped Slab   

 

             

                 Phase 2EX2 Tunnel 2B Roof Through Bolts

 

 

 

 

 

                                    

                                Phase 2C3 Caulking Shroud Piece for Mockup  

 

                             

                                      Phase 3EX5 Demolition of Roof of Tunnel 3C

 

                           

                                         Phase 3EX2 Tunnel 3B Placing Concrete on

                                                                  Sloped Slab

 

 

 

 

 

       

      Phase 3EX5 Removal of Escalator from Tunnel 3C

 

     

 

 

 

                            

                             Phase 3EX5 Tunnel 3C – Demolition of Floor Around

                                                            the Elevator Pit